Chapmans Peak Beach Hotel | Hotel in Hout Bay

8.8 (739 Reviews) |  3 Bathrooms  10 Guests
Scott Estate Hotel | Chapmans Peak Beach Hotel

Hotel in Scott Estate, Hout Bay

Chapmans Peak Hotel is located in a renovated 19th century building in picturesque Hout Bay. It offers modern rooms, a seafood restaurant with Atlantic Ocean views and free private parking. The bright rooms at Chapman’s Peak Hotel have modern furniture and floor-to-ceiling windows. Each private bathroom is stocked with a bathrobe, slippers and free bathroom amenities. Rooms also have satellite TV. Chapmans Peak Restaurant serves fresh seafood including calamari and lobster. Guests can dine on the outdoor terrace while enjoying Hout Bay views. Cigar Bar and Lounge shows live sports matches and has a fireplace. The hotel is located 20 minutes’ drive from Cape Town’s center. Guests can reach Cape Town International Airport with a 45-minute drive from Chapmans Peak Hotel.

Chapmans Peak Beach Hotel is located in Hout Bay.

This 24 Bedrooms Hotel is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Guest Services, Accessibility, Sports/Activities, and several others. This is a good star rated property and has over 739 reviews with the average score of 8.8 . Coming to Hout Bay and needing a place to stay? Be it for work or for leisure, consider staying at this Hotel for your next visit, you will surely love it.

You can check the reviews and description of this 24 Bedrooms Hotel if you want to learn more about this place in Hout Bay. These details are authentic, as they are provided by our partner, booking.com.

This Chapmans Peak Beach Hotel in Hout Bay is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Chapmans Peak Beach Hotel”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Hotel, please let us know.

Show more

Amenities

Air Conditioner
Parking
Pool
Designated Smoking Area
View
Wheelchair Accessible
Ocean View
Balcony/Terrace
Oceanfront
Accessibility
Transportation/Shuttle
Security/Safety
Business Services
Sports/Activities
Fireplace/Heating
Restaurant
Bar
Guest Services
Entertainment
Internet
Laundry

Facility Overview

Breakfast
  • Wine/Champagne
  • Special diet meals (on request)
  • Restaurant
  • Bar
Parking
  • Private Parking
  • Parking garage
  • Accessible parking
  • Parking on site
  • Free parking
  • Parking
Activities
  • Beach
  • Canoeing
  • Beachfront
  • Fishing
  • Hiking
  • Cycling
General
  • Non-smoking rooms
  • Safe
  • Elevator
  • Designated smoking area
  • Smoke-free property
  • Heating
  • Air conditioning
  • Facilities for disabled guests
Guest Services
  • Ironing service
  • Airport shuttle
  • Dry cleaning
  • Airport shuttle (additional charge)
  • Meeting/Banquet facilities
  • Daily housekeeping
  • Laundry
  • Baggage storage
  • Fax/Photocopying
  • Room service
  • Business center
  • Invoice provided
Internet
  • Free Wifi
  • Internet
  • Wifi
Outdoors
  • Terrace
  • Outdoor pool
Security/Safety
  • Key card access
  • Smoke alarms
  • Fire extinguishers
  • Security alarm
  • 24-hour security
  • Staff follow all safety protocols as directed by local authorities
Spa
  • Swimming pool
  • Beach chairs/Loungers

Policies

Check-in
The minimum age for check-in is 18
Cancellation policy
Free cancellation
Payment Policy
Credit card required
Pet Policy
Pets are not allowed

The credit card used to make the reservation must be present at check in.guests are required to show a photo id and credit card upon check-in. please note that all special requests are subject to availability and additional charges may apply.

Reviews

Value for money:
8.7
Location:
9.44
Staff:
9.23
Facilities:
8.9
Comfort:
9.31
Cleanliness:
9.37
Esther
Sep 25, 2025 07:00:00 AM
Review Score:   8
South Africa
Reviewer Type: Extended Group
Travel Purpose: leisure
Positive: View & bedroom
Summary: beautiful and convenient
See All Reviews

Room Arrangement

Room Info Facilities
Penthouse Sea View - Adults only
Room Type: Suite
Room Size: 78 m2
1 King bed(s) Bed

Bathroom

Toilet paper, Shampoo, Hairdryer, Shower cap, Body soap, Free toiletries, Bathtub, Walk-in shower, Towels, Bathrobe, Conditioner, Toilet, Shower, Guest bathroom, Slippers, Private bathroom

General

Safe, Hardwood or parquet floors, Smoke Alarm, Key card access, Heating, Air conditioning

Media & Technology

Satellite channels, TV, Flat-screen TV, Telephone

Kitchen

Microwave, Wine glasses, Electric kettle, Kitchenware, Stovetop, Kitchenette, Dining table, Refrigerator

Outdoors

Terrace, Outdoor furniture, Balcony

Living Area

Desk, Dining area, Sitting area, Fireplace

View

View, Sea view

Bedroom

Wardrobe or closet, Linens

Accessibility

Entire unit wheelchair accessible, Upper floors accessible by elevator, Accessible by elevator

Pool and Spa

Plunge Pool, Pool towels, Pool with a view

Food & Drink

Bottle of water

Room Amenities

Non-feather pillow

Layout

Window

Cleanliness & disinfection

Hand sanitizer
Second Floor Sea View Room
Room Type: Twin/Double
Room Size: 39 m2
1 King bed(s) Bed
Second Floor Sea View Room

Bathroom

Toilet paper, Shampoo, Hairdryer, Body soap, Free toiletries, Bathtub, Walk-in shower, Towels, Bathrobe, Conditioner, Toilet, Shower, Shower cap, Slippers, Private bathroom

General

Safe, Interconnecting room(s) available, Hardwood or parquet floors, Smoke Alarm, Key card access, Heating, Air conditioning

Media & Technology

Satellite channels, TV, Flat-screen TV, Telephone

Outdoors

Outdoor furniture, Balcony

Kitchen

Wine glasses, Electric kettle, Refrigerator

Living Area

Desk, Sofa, Sitting area

View

View, Sea view

Bedroom

Wardrobe or closet, Linens

Accessibility

Entire unit wheelchair accessible, Upper floors accessible by elevator, Accessible by elevator

Pool and Spa

Pool towels

Food & Drink

Bottle of water

Room Amenities

Non-feather pillow

Layout

Window

Cleanliness & disinfection

Hand sanitizer
First Floor Back Facing Room No Sea View
Room Type: Twin/Double
Room Size: 28 m2
1 King bed(s) Bed
2 Twin bed(s) Bed
First Floor Back Facing Room No Sea View

Bathroom

Toilet paper, Shampoo, Hairdryer, Body soap, Free toiletries, Bathtub, Conditioner, Towels, Bathrobe, Toilet, Shower, Shower cap, Slippers, Private bathroom

General

Safe, Interconnecting room(s) available, Hardwood or parquet floors, Smoke Alarm, Key card access, Heating, Air conditioning

Media & Technology

Satellite channels, TV, Flat-screen TV, Telephone

Outdoors

Outdoor furniture, Balcony

Kitchen

Wine glasses, Electric kettle, Refrigerator

Living Area

Desk

Internet

Wireless internet

Bedroom

Wardrobe or closet, Linens

Accessibility

Entire unit wheelchair accessible, Upper floors accessible by elevator, Accessible by elevator

Pool and Spa

Pool towels

Food & Drink

Bottle of water

Room Amenities

Non-feather pillow

Layout

Window

Cleanliness & disinfection

Hand sanitizer
First Floor Sea View Room
Room Type: Twin/Double
Room Size: 28 m2
1 King bed(s) Bed
First Floor Sea View Room

General

Safe, Air conditioning, Hardwood or parquet floors, Key card access

Media & Technology

TV, Flat-screen TV

Bathroom

Bathtub or shower, Toilet paper, Shampoo, Hairdryer, Free toiletries, Conditioner, Towels, Bathrobe, Toilet, Body soap, Shower cap, Slippers

Outdoors

Balcony

Kitchen

Electric kettle, Refrigerator

Living Area

Desk

Internet

Wireless internet

Bedroom

Wardrobe or closet, Linens

Accessibility

Entire unit wheelchair accessible, Upper floors accessible by elevator, Accessible by elevator

Pool and Spa

Pool towels

Food & Drink

Bottle of water

Room Amenities

Non-feather pillow

Cleanliness & disinfection

Hand sanitizer
Second Floor Back Facing Room No Sea View
Room Type: Double
Room Size: 30 m2
1 King bed(s) Bed
 Second Floor Back Facing Room No Sea View

Bathroom

Toilet paper, Shampoo, Hairdryer, Free toiletries, Bathtub, Conditioner, Towels, Bathrobe, Toilet, Shower, Shower cap, Slippers, Body soap

General

Safe, Air conditioning, Hardwood or parquet floors, Key card access

Media & Technology

TV, Flat-screen TV, Satellite channels

Outdoors

Terrace, Balcony

Kitchen

Electric kettle, Refrigerator

Living Area

Desk, Sitting area

Internet

Wireless internet

Bedroom

Wardrobe or closet, Linens

Accessibility

Entire unit wheelchair accessible, Upper floors accessible by elevator, Accessible by elevator

Pool and Spa

Pool towels

Food & Drink

Bottle of water

Room Amenities

Non-feather pillow

Cleanliness & disinfection

Hand sanitizer
Check Hotel Availability
Nightly rates from:
USD146
You will be redirected to  
Hot Deal - It has been viewed 70 times today
Not the right fit? Check out our other properties in Scott Estate
11 on Orange From US $1,085
         

|
10.0 (4 Reviews)
House
  • Air Conditioner
  • Parking
  • Pool
ZenCapeTown Holiday House From US $238
         

10.0 (2 Reviews)
House
  • Parking
  • Pool
  • TV
ZenCapeTown Holiday House From US $247
         

10.0 (2 Reviews)
House
  • Parking
  • Pool
  • TV
The Spa House From US $1,241
         

|
10.0 (3 Reviews)
Villa
  • Air Conditioner
  • Parking
  • Pet Friendly
Hout Bay Hideaway From US $128
         

|
9.8 (73 Reviews)
House
  • Parking
  • Pool
  • View
Bellevue on Champagne w/Pool, Sea & Mountain View From US $728
         

New
House
  • Security/Safety
  • Bedding/Linens
  • Wellness Facilities
Houtbay Hilltop Villa
New
From US $379
         

New
House
  • Pool
  • Private Pool
  • Balcony/Terrace
Luxurious 4 bedroom house with private pool. From US $303
         

10.0 (22 Reviews)
Villa
  • Air Conditioner
  • Parking
  • Pool
Peaceful, stunning pool, beaches & wine From US $131
         

9.2 (5 Reviews)
Cottage
  • Parking
  • Pool
  • Balcony/Terrace